2000
Baofeng Special Steel Plant was established with an annual output of 25000 tons of stainless steel round steel and steel ingots
2002
Baofeng Perforation Plant has been put into production, with an annual output of 18000 tons of stainless steel pipes
2003
Baofeng Seamless Pipe Factory has been put into production, with an annual output of 6000 tons of stainless steel seamless pipes
2005
Baofeng Import and Export Trading Company was established and successfully exported 2000 tons from all over the world
2006
Baofeng is building a new stainless steel industrial park in Songyang County, Zhejiang, and relocating the entire stainless steel seamless pipe production base
Baofeng's annual production line of 20000 tons of stainless steel seamless tubes for cold drawing and cold rolling has been put into production
笔记
2007
Baofeng Steel Industry Group Co., Ltd. Established
2008
Successfully obtained the European Pressure Equipment Manufacturing License (PED) and exported products to the European market
630 large diameter hydraulic cold drawing production line put into operation
Baofeng Product Testing Center Completed and Fully Put into Use
2009
Baofeng has been certified by 7 major shipping classification societies worldwide, and its products have successfully entered the shipbuilding and military fields
2010
Baofeng has obtained the qualification of CNOOC as a supplier and has become a framework supplier
Baofeng Special Steel's overall equipment renovation, the use of high-temperature nickel based alloy production line, and the establishment of Baofeng Special Materials Business Unit
笔记
2012
Baofeng corrosion-resistant high-temperature alloy pipes made of N04400, N06600, N06625, N08800, N08825, Hastelloy C276, B, B2 and other materials have passed the tests of the National Steel Material Testing Center and SGS Product Testing Center
2014
Baofeng has completed the 5S system transformation of the piercing plant and seamless pipe plant, and fully implemented a refined production control system
2015
Baofeng Welding Pipe Workshop Put into Operation Baofeng was rated as a "National High tech Enterprise
”
2016
Baofeng has obtained the qualification as a supplier of PetroChina and has become a first-class framework supplier
2017
Baofeng has obtained the qualification as a supplier of PetroChina and successfully became a framework supplier
2020
Baofeng has acquired 287 acres of land in the Chishou Industrial Zone of Songyang County for the construction of a new stainless steel pipe production base
The project is divided into three phases, the first phase is a production base for 10000 tons of stainless steel coil tubes and a production base for 30000 tons of stainless steel heat exchange tubes per year
Phase II Annual 50000 ton Stainless Steel Welded Pipe Production Base
2021
The construction of the first phase of stainless steel coil and stainless steel heat exchange pipe production base started simultaneously
The first phase of the stainless steel coil and stainless steel heat exchange tube production plant has been completed and equipment installation has begun
2022
The first phase of stainless steel coil production base and stainless steel heat exchange tube production base are fully put into operation
Civil construction of the second phase stainless steel welded pipe production base started
Baofeng steel group co.,ltd.
stock reform meets the listing requirements
2023
Phase II stainless steel welded pipe production base fully put into operation
2024
The third phase of the new factory area has fully reached the designed production capacity
Baofeng Old Factory Differentiated into Two Phases of Upgrading and Renovation
Phase I renovation of the stainless steel seamless intermediate pipe production line in workshop 1 and put it into production
2025
Baofeng Old Factory Differentiated into Two Phases of Upgrading and Renovation
The second phase will renovate the stainless steel seamless large pipe production line in the second workshop and put it into production
Baofeng steel group co.,ltd. goes public